ID # | 11405163 |
פרטי בנין | 8 חדר שינה , 4 חדר אמבטיה , גודל מגרש 0.05 דונם , שטח פנימי 3432 רגל מרובע , 319 מ”ר , בבניין יש 3 קומות 13 ימים (DOM) |
מיסים (בשנה) | $9,944 |
מרתף | מרתף שלם Full basement |
English Webpage | |
אוטובוס | 1 דקות לאוטובוס BM1 |
3 דקות לאוטובוס B47 | |
4 דקות לאוטובוס B82 | |
7 דקות לאוטובוס B6 | |
8 דקות לאוטובוס B46 | |
9 דקות לאוטובוס B103, BM2 | |
תחנת רכבת | 3.5 מיילים לתחנת הרכבת "East New York" |
3.8 מיילים לתחנת הרכבת "Nostrand Avenue" | |
****WILL BE DELIVERED VACANT. Being sold in AS-IS condition. All tenants are cooperating. PLEASE SEE THE CERTIFICATE OF OCCUPANCY PHOTO. More photos & Matterport interactive 3D model, coming soon! 1st SHOWING DATES ARE SATURDAY 01/18/2025 & SUNDAY 01/19/2025. SEE OPEN HOUSE TIMES. **** Fully Attached Brick 3 Unit Property in Flatlands, Brooklyn 8 Bedrooms / 4 Bathrooms Layout: Top Fl: (occupied) 3 Bedrooms, 1 Bathroom, Living Room, Kitchen, & Balcony 2nd Fl: (occupied) 2 Bedrooms, 1 Bathroom, Living Room, Kitchen Ground/1st Fl: (occupied) 3 Bedrooms, 1 Bathroom, Living Room, Kitchen, Private Backyard (Backyard is approx 22 ft wide by 12 ft deep and has 6 beautiful arborvitae evergreen trees that are approx. 9 ft tall!) Basement: (vacant) Full semi-finished, 1 Bedroom, Living room, plus kitchen, 3/4 bathroom, walk-in closet, laundry room w/ hookups (but no washer/dryer appliance), enclosed boiler room w/ metal door, 3 sump pumps installed & basement ceiling height ranges from 7 ft 8 inches to 7 ft 10 inches. Each floor is approximately 1,144 sqft. All kitchens have stainless steel appliances. The bottom 2 levels (basement 1 bedroom 1 bathroom apt & ground floor 3 bedroom 1 bathroom apt) have the potential to easily be converted to a duplex apartment. Originally, there was a door in the ground floor apartment that led down into the basement. That door was removed & the wall was closed. However, one could very easily reopen the wall & reinstall a doorway that leads to the staircase to the basement. Private Driveway in front (fits 2 cars). Roof was replaced new in 2006. No known issues w/ roof. In August 2017, storm drains were installed at the end of the driveway & prevents any drainage/flooding issues! Note: All uploaded photos were taken by iPhone on 01/12/2025.